SENTINEL-7 Results

Cost Breakdown

Total Lifetime CA Cost

€6.7M

(€890K/year over 7.5 years)

CategoryAnnualLifetimeShare
Fuel Consumption
€120K€900K13.5%
Ground Station
€210K€1.6M23.6%
Personnel
€340K€2.5M38.2%
Mission Time Lost
€150K€1.1M16.9%
Coordination
€70K€525K7.9%
Trade-Space Visualization
Cost (low to high)
Infeasible (SDM violation)

Annual collision avoidance cost as a function of orbital altitude and collision probability threshold. Red regions indicate SDM non-compliance (altitude > 900 km with Pc threshold > 1e-4).

SDM Compliance
Ruleset: ESA (ESSB-ST-U-007), ISO 24113
RuleThresholdComputed ValueStatus
25-year disposal< 25 years4.8 years (natural decay)Pass
Collision probability< 1e-4 per event7.1e-5Pass
Casualty risk< 1e-46.3e-5Pass
PassivationRequiredPlannedPass
Scenario Comparison (SENTINEL-7)
Metric
Baseline (Chemical)
Electric Propulsion
Automated DecisionBest
Delta (vs Baseline)
Total Annual Cost€890K€930K€650K
Fuel Consumption€120K€55K€135K€-65000+€15K
Ground Station€210K€240K€180K+€30K€-30000
Personnel€340K€360K€195K+€20K€-145000
Mission Time Lost€150K€200K€100K+€50K€-50000
Coordination€70K€75K€40K+€5K€-30000
Maneuvers / Year3.43.43.8
Fuel Budget Used68%22%74%